§ 21825. CIWMB--Preliminary Postclosure Maintenance Plan Contents.
27 CA ADC § 21825Barclays Official California Code of Regulations
Barclays California Code of Regulations
Title 27. Environmental Protection
Division 2. Solid Waste (Refs & Annos)
Subdivision 1. Consolidated Regulations for Treatment, Storage, Processing or Disposal of Solid Waste
Chapter 4. Documentation and Reporting for Regulatory Tiers, Permits, WDRs, and Plans
Subchapter 4. Development of Closure/Postclosure Maintenance Plans
27 CCR § 21825
§ 21825. CIWMB--Preliminary Postclosure Maintenance Plan Contents.
(a) The purpose of the preliminary postclosure maintenance plan is to provide a basis for the operator to establish a preliminary estimate of postclosure monitoring, maintenance, and inspection costs certified for accuracy by a registered civil engineer or certified engineering geologist, and enable the CIWMB to assess the reasonableness of the cost estimate.
Credits
Note: Authority cited: Section 40502, Public Resources Code. Reference: Sections 43020, 43021 and 43103, Public Resources Code.
History
1. New section filed 6-18-97; operative 7-18-97 (Register 97, No. 25).
2. Amendment of section heading and subsections (b)(1) and (2), new subsection (b)(3) and amendment of Note filed 2-25-2008; operative 2-25-2008 pursuant to Government Code section 11343.4 (Register 2008, No. 9).
This database is current through 8/30/24 Register 2024, No. 35.
Cal. Admin. Code tit. 27, § 21825, 27 CA ADC § 21825
End of Document |