Home Table of Contents

§ 21200. CalRecycle--Change of Ownership During Closure or Postclosure Maintenance.

27 CA ADC § 21200Barclays Official California Code of Regulations

Barclays California Code of Regulations
Title 27. Environmental Protection
Division 2. Solid Waste (Refs & Annos)
Subdivision 1. Consolidated Regulations for Treatment, Storage, Processing or Disposal of Solid Waste
Chapter 3. Criteria for All Waste Management Units, Facilities, and Disposal Sites
Subchapter 5. Closure and Post-Closure Maintenance
Article 2. Closure and Post-Closure Maintenance Standards for Disposal Sites and Landfills
27 CCR § 21200
§ 21200. CalRecycle--Change of Ownership During Closure or Postclosure Maintenance.
(a) An owner or operator of a disposal site who plans to sell, transfer or convey the ownership or operation of the disposal site to a new owner or operator shall notify EA and CalRecycle 45 days prior to the anticipated transfer of title. This notification shall include the name(s), address(es) and phone number(s) of the new owner or operator.
(b) The new owner or operator shall submit the following to EA and CalRecycle as part of the notification under ¶(a):
(1) Documentation of the financial assurance demonstrations of the new owner or operator, in compliance with the requirements of Articles 2 and 4 of Subchapter 2, Chapter 6 of this Title; and
(2) An affidavit from the new owner or operator stating that the new owner or operator has read the governing SWFP (if applicable), closure plan, and postclosure maintenance plan and will comply with all terms and conditions in the SWFP (if applicable), closure plan, and postclosure maintenance plan, and that all new information submitted is correct.
(c) The EA shall review the submitted information to determine if the new owner or operator has provided all required information to comply with the terms and conditions of the SWFP (if applicable), closure plan, and the postclosure maintenance plan. The EA shall also obtain written confirmation from CalRecycle that the new owner or operator has complied with the financial assurance requirements of Articles 2 and 4, Subchapter 2, Chapter 6.
(1) If the EA determines that the new owner or operator has complied with all requirements, the EA shall send written notification to the prior owner and operator, new owner and operator, RWQCB, and CalRecycle within 30 days of receipt of the notification of transfer of title. Within 15 days thereafter, the EA shall send the owner and operator a copy of a changed SWFP, if applicable.
(2) If the EA determines that the new owner or operator has not complied with all requirements, the EA shall send written notification of this determination to the prior owner and operator, new owner and operator, RWQCB, and CalRecycle within 30 days of receipt of the notification of transfer of title. The EA shall include the basis for this determination of inadequacy.

Credits

Note: Authority cited: Sections 40502 and 43020, Public Resources Code. Reference: Sections 43021, 43103 and 44005, Public Resources Code.
History
1. New section filed 6-18-97; operative 7-18-97 (Register 97, No. 25).
2. Amendment of section heading, repealer and new section and amendment of Note filed 4-9-2010; operative 7-1-2010 (Register 2010, No. 15).
This database is current through 4/12/24 Register 2024, No. 15.
Cal. Admin. Code tit. 27, § 21200, 27 CA ADC § 21200
End of Document