§ 10000.10. Contracting in Phases.
Where the Executive Director determines it is necessary or desirable for a project to be performed in separate phases, the Executive Director may negotiate a price for the initial phase work. To establish a contract price for the initial portion of phased work, the Executive Director must first determine that the chosen firm is best qualified to perform the entire project. A contract for work to be performed in phases without a negotiated total contract price must provide that the state may, at its option utilize that firm to perform other phases of the work to be later negotiated and reflected in a subsequent written instrument. The procedures established herein with respect to estimates and negotiation as specified herein shall otherwise apply.

Credits

Note: Authority cited: Section 4526, Government Code. Reference: Section 4526, Government Code; and Article XXII, California Constitution, Sections 1-2.
History
1. New section filed 10-6-2006; operative 10-6-2006 pursuant to Government Code section 11343.4 (Register 2006, No. 40).
2. Editorial correction of History 1 (Register 2006, No. 44).
This database is current through 5/10/24 Register 2024, No. 19.
Cal. Admin. Code tit. 21, § 10000.10, 21 CA ADC § 10000.10
End of Document