§ 18221.5.1. In-Vessel Digestion Facility Plan.
14 CA ADC § 18221.5.1Barclays Official California Code of Regulations
14 CCR § 18221.5.1
§ 18221.5.1. In-Vessel Digestion Facility Plan.
Each operator of a Medium Volume In-vessel Digestion Facility that is required to obtain a Registration Permit, as set forth in section 17896.12 and Title 14, Division 7, Chapter 5.0, Article 3.0, (commencing with section 18100) shall, at the time of application, file an In-vessel Digestion Facility Plan (“Plan”) with the EA as required in section 17896.14 of this Title. In order to maintain the permit, the operator must file amendments as necessary to maintain the accuracy of the Plan. Such amendments, or lack thereof, may become the basis for changes in the permit or for revocation of the permit. The Plan shall contain the following:
(d) days and hours that the facility is to operate. If the hours of waste receipt differ from the hours of material processing, each set of hours may be stated. For facilities with continuous operations, indicate the start of the operating day for purpose of calculating amount of waste received per operating day. The operator may also indicate whether or not, and when, other activities, such as routine maintenance will take place, if those activities will occur at times other than those indicated above;
Credits
Note: Authority cited: Sections 40502, 43020 and 43021, Public Resources Code. Reference: Sections 40053, 43020 and 43021, Public Resources Code.
History
1. New section filed 11-10-2015; operative 1-1-2016 (Register 2015, No. 46).
This database is current through 5/19/23 Register 2023, No. 20.
Cal. Admin. Code tit. 14, § 18221.5.1, 14 CA ADC § 18221.5.1
End of Document |