§ 18105.11. Voiding of a Standardized Permit.
14 CA ADC § 18105.11Barclays Official California Code of Regulations
14 CCR § 18105.11
§ 18105.11. Voiding of a Standardized Permit.
Every standardized permit shall be void 30 days after cessation of operations. Any operator who intends to cease operations shall notify the enforcement agency of his/her last proposed date of operation at least 15 days in advance. The enforcement agency shall forward a copy of this notification to the Department within 7 days. “Cessation of operations” does not include temporary operational shutdowns which are seasonal or intermittent in nature.
Credits
Note: Authority cited: Sections 40502, 43020 and 43021, Public Resources Code. Reference: Sections 43020, 43021 and 43000-45802, Public Resources Code.
History
1. New section and forms CIWMB 81 and 83 filed 3-1-95; operative when the minimum standards to be set forth in Chapters 3.0 or 3.1 of Division 7 of this Title are filed with the Secretary of State and become effective and operative (Register 95, No. 9).
2. Change without regulatory effect moving forms to section 18831, appendix A filed 4-2-96 pursuant to section 100, title 1, California Code of Regulations (Register 96, No. 14).
3. Amendment filed 11-10-2015; operative 1-1-2016 (Register 2015, No. 46).
This database is current through 3/10/23 Register 2023, No. 10.
Cal. Admin. Code tit. 14, § 18105.11, 14 CA ADC § 18105.11
End of Document |