Home Table of Contents

§ 2360.4. Reporting for Electric Vehicle Service Providers.

13 CA ADC § 2360.4Barclays Official California Code of Regulations

Barclays California Code of Regulations
Title 13. Motor Vehicles (Refs & Annos)
Division 3. Air Resources Board
Chapter 8.3. Electric Vehicle Supply Equipment Standards
13 CCR § 2360.4
§ 2360.4. Reporting for Electric Vehicle Service Providers.
(a) Applicability. The requirements of this section apply to all EVSPs operating or intending to operate one or more publicly available Level 2 or DCFC EVSE installed in California.
(b) Initial reporting deadline for existing EVSPs. No later than August 15, 2020, the EVSP shall collect and submit the following information to the Executive Officer:
(1) Initial EVSP contact information as specified in subsection (g).
(2) An EVSE model certification, as specified in subsection (h), for each EVSE model operated in California.
(3) EVSE inventory as specified in subsection (i). For this initial inventory report, the EVSP may omit information that it has not collected in the past if that information could not be reasonably obtained within the past 45 days.
(c) Initial reporting deadline for new EVSPs. If an EVSP intends to operate one or more publicly available Level 2 or DCFC EVSE installed in California on or after July 1, 2020, then that EVSP shall collect and submit the following information to the Executive Officer at least 45 days before installation of any EVSE in California:
(1) Initial contact information as specified in subsection (g).
(2) An EVSE model certification, as specified in subsection (h), for each EVSE model that the EVSP intends to install in California within the next 45 days.
(d) Reporting deadline for new EVSE models. If an EVSP intends to operate a new, unique EVSE model in California on or after July 1, 2020, then that EVSP shall collect and submit initial contact information to the Executive Officer as specified in subsection (g) at least 45 days prior to installation of that EVSE model in California.
(e) Annual reporting deadline for all EVSPs. On or before March 1 of each year, the designated contact for the EVSP shall collect and submit to the Executive Officer annual EVSE inventory information for the prior calendar year, as specified in subsection (i). If the EVSP operates one or more EVSE that require payment for use, the designated contact for the EVSP shall also collect and submit to the Executive Officer annual EVSE payment information for the prior calendar year, as specified in subsection (j). The first annual report is due March 1, 2022. For example, an EVSP must submit information no later than March 1, 2022, for EVSE that it operated between January 1, 2021, and December 31, 2021.
(f) Information updates. Any EVSP reporting under this subsection shall update its initial contact information and EVSE model certification within 45 days of any changes to that information.
(g) Initial EVSP contact information. The initial EVSP contact information reported by the EVSP shall include all of the following information:
(1) EVSP company name.
(2) Website for EVSP.
(3) Name of designated contact person.
(4) Email of designated contact person.
(5) Phone number of designated contact person.
(6) Mailing address of designated contact person.
(h) EVSE model certification. The EVSE model certification reported by the EVSP shall include all of the following information, for each EVSE model:
(1) Manufacturer name and model number.
(2) Type of EVSE (Level 2 or DCFC EVSE).
(3) Nominal voltage, current supported (amps), power supported (kilowatts).
(4) Number of ports.
(5) Number of connectors and connector standard.
(6) Type of payment devices installed.
(7) Manufacturer website.
(8) EVSP toll-free number or numbers displayed on the EVSE model.
(9) EVSE model photos: front, back, payment hardware, fee display (if display is multiple pages, include photos of complete information).
(10) Kiosk model photos: front, back, payment hardware, fee display (if display is multiple pages, include photos of complete information), if applicable.
(i) Annual EVSE inventory. The annual EVSE inventory report filed by the EVSP shall include all of the following information, broken down per publicly available EVSE operated by the EVSP in California:
(1) New EVSE installations in California in the reporting period:
(A) Station ID.
(B) Station Name.
(C) EVSE ID or serial number.
(D) Station Address.
(E) Geographic coordinates of the station (e.g., Latitude: 50.770774, Longitude: -126.104965).
(F) Model of EVSE.
(2) Listing of retired, decommissioned, or removed EVSE in California during the reporting period:
(A) Station ID.
(B) Station Name.
(C) EVSE ID or serial number.
(D) Station Address.
(E) Geographic coordinates of the station (e.g., Latitude: 50.770774, Longitude: -126.104965).
(F) Model of EVSE.
(j) Annual EVSE payment information for EVSE installed in California that require payment. The annual EVSE payment report filed by the EVSP shall include all of the following information, reported in statewide aggregated numbers:
(1) Total number of charging sessions started with a credit card.
(2) Total number of charging sessions started with a mobile payment.
(3) Total number of charging sessions started with a toll-free number.
(4) Total number of charging sessions started with a membership RFID card.
(5) Total number of charging sessions started with a service provider application.
(6) Total number of charging sessions with other methods of payment, including sessions that did not require payment.
(k) Reporting to the National Renewable Energy Laboratory (NREL) Alternative Fuels Data Center (AFDC):
(1) No later than six months after July 1, 2020, and thereafter at least once per month if there are any changes, each EVSP shall report to NREL in accordance with this subsection.
(2) For any EVSE decommissioned since the last report, the EVSP shall report the date the EVSE was decommissioned. For any EVSE no longer operated by the EVSP since the last report, the EVSP shall report the date the EVSP ceased operating the EVSE.
(3) The EVSP shall ensure that its data reported to NREL matches corresponding data reported to the Executive Officer in its annual EVSE inventory and usage information report.
(4) The data reported by the EVSP shall include all of the following, broken down per publicly available EVSE operated by the EVSP in California:
(A) Station ID.
(B) Station Name.
(C) Phone number to call if a user has problems at the station.
(D) Access type (e.g., private, private--government only, private--residential, public, public--limited hours, public--call-ahead, public--card key at all times, public--credit card at all times (no membership requirement)).
(E) Access Days/Times--hours of public operation for the station.
(F) Station Type--Primary customer the station is intended to serve (e.g., multi-unit dwelling, workplace, fleet, transportation network company, public).
(G) Payment Methods--list of payment methods accepted at the station.
(H) Payment Actions--list of how a user pays with their payment method at the station.
(I) Geographic coordinates of the station (e.g., Latitude: 50.770774, Longitude: -126.104965).
(J) Network--the network service provider (EVSP) of the station.
(K) Pricing information (e.g., $/kWh (kilowatt-hour), $/MJ (megajoule), demand response, variable, non-member fee, parking fee).
(L) Open Date--date station was first in service.
(M) Address--Country, State, Postal Code, City, Street Address, Directions.
(N) EVSE ID--a unique identifier for the EVSE within the network provided by the EVSP.
(O) Geographic coordinates of the EVSE (e.g., Latitude: 50.770774, Longitude: -126.104965).
(P) Manufacturer of EVSE.
(Q) Model of EVSE.
(R) Serial Number of EVSE.
(S) Power Sharing capabilities of EVSE--if this EVSE has multiple ports does it distribute power among all ports in use.
(T) Port ID--a unique identifier for each port, unique within the context of the EVSP servicing the EVSE.
(U) Level--classification of the port which indicates the rate of the battery refuel (e.g., AC Level 2 (3.3kW - 22kW), DC Fast (23kW+)).
(V) Connectors--connector types available at the EVSE to connect to the vehicle (e.g., SAE J1772, J1772 Combo, CHAdeMO).
(l) Confidential business information. If the EVSP believes any information required to be reported under this section is confidential business information, the EVSP shall prominently label the specific information considered to be confidential, and shall include an explanation for why the EVSP believes the identified information is confidential. All documents (including spreadsheets and other items not in a standard document format) designated as containing confidential business information also must prominently display the phrase “Contains Confidential Business Information” above the main document title and in a running header. All information reported and not identified as confidential business information is subject to public disclosure pursuant to California Code of Regulations, title 17, sections 91000 through 91022, and the California Public Records Act (Gov. Code, § 6250 et seq.). The Board may also disclose information claimed by the applicant to be confidential as required by law.
(m) The EVSP shall submit the initial EVSP contact information, EVSE model certification, annual EVSE inventory and usage information, as well as any subsequent updates to that information, electronically via email to [email protected], unless the Executive Officer has approved in writing another format.

Credits

Note: Authority cited: Sections 39600, 39601 and 44268.2, Health and Safety Code. Reference: Sections 44268 and 44268.2, Health and Safety Code.
History
1. New section filed 5-29-2020; operative 7-1-2020 (Register 2020, No. 22).
This database is current through 4/19/24 Register 2024, No. 16.
Cal. Admin. Code tit. 13, § 2360.4, 13 CA ADC § 2360.4
End of Document