§ 13055. Fees.
14 CA ADC § 13055Barclays Official California Code of Regulations
Barclays California Code of Regulations
Title 14. Natural Resources
Division 5.5. California Coastal Commission (Refs & Annos)
Chapter 5. Coastal Development Permits Issued by Coastal Commissions
Subchapter 1. Regular Permits
Article 4. Schedule of Filing Fees for Processing Permit Applications and Other Filings
14 CCR § 13055
§ 13055. Fees.
Square Footage of Proposed Residence | Fee |
1500 or less | $4,413 |
1501 to 5000 | $6,620 |
5001 to 10,000 | $8,826 |
10,001 or more | $11,033 |
For developments that include residences of different sizes, the fee shall be based upon the average square footage of all the residences.
Cubic Yards of Grading | Fee |
51 to 100 | $736 |
101 to 1000 | $1,471 |
1001 to 10,000 | $2,942 |
10,001 to 100,000 | $4,413 |
100,001 to 200,000 | $7,355 |
200,001 or more | $14,710 |
This fee does not apply to residential projects that qualify for administrative permits.
(5) For office, commercial, convention, or industrial (including energy facilities as defined in Public Resources Code section 30107) development, and for all other development not otherwise identified in this section, the fee shall be based upon either the gross square footage as shown in (5)(A) or the development cost as shown in (5)(B), whichever is greater.
Square Footage of Proposed Development | Fee |
1000 or less | $7,355 |
1001 to 10,000 | $14,710 |
10,001 to 25,000 | $22,065 |
25,001 to 50,000 | $29,420 |
50,001 to 100,000 | $44,130 |
100,001 or more | $73,550 |
Development Cost | Fee |
$100,000 or less | $4,413 |
$100,001 to $500,000 | $8,826 |
$500,001 to $2,000,000 | $14,710 |
$2,000,001 to $5,000,000 | $29,420 |
$5,000,001 to $10,000,000 | $36,775 |
$10,000,001 to $25,000,000 | $44,130 |
$25,000,001 to $50,000,000 | $73,550 |
$50,000,001 to $100,000,000 | $147,100 |
$100,000,001 or more | $367,750 |
2. As used herein, the term “development cost” includes all expenditures, including the cost for planning, engineering, architectural, and other services, made or to be made for designing the project plus the estimated cost of construction of all aspects of the project both inside and outside the Commission's jurisdiction.
(6) The request for a boundary determination pursuant to either section 13255.1 or 13576(c) shall be accompanied by a filing and processing fee of $368. For a request for a boundary determination pursuant to section 13255.1 or 13576(c)(2) that pertains to two or more parcels, the fee shall be paid on a per parcel basis.
(c) The fees established in this section shall be increased annually by an amount calculated on the basis of the percentage change from the year in which this provision becomes effective in the California Consumer Price Index for Urban Consumers as determined by the Department of Industrial Relations pursuant to Revenue and Taxation Code Section 2212. The increased fee amounts shall become effective on July 1 of each year. The new fee amounts shall be rounded to the nearest dollar.
In no case shall such reduced fees be less than double the amount specified in section (a) above. For applications that include both ATF development and development that has not yet occurred, the ATF fee shall apply only to the ATF development. In addition, payment of an ATF fee shall not relieve any persons from fully complying with the requirements of Division 20 of the Public Resources Code or of any permit granted thereunder or from any penalties imposed pursuant to Chapter 9 of Division 20 of the Public Resources Code.
(e) Where a development consists of a land division including, but not limited to, lot line adjustments or issuance of a conditional certificate of compliance pursuant to Government Code section 66499.35(b), the fee shall be $4,413 for each of the first four lots, plus $1,471 for each additional lot. Conversion to condominiums shall be considered a division of the land.
(f) If different types of developments are included in one permit application, the fee shall be the sum of the fees that would apply if each development was proposed in a separate application. However, in no case shall the fee for residential development exceed $147,100 and in no case shall the fee for all other development exceed $367,750.
(g) In addition to the above fees, the commission may require the applicant to reimburse it for any additional reasonable expenses incurred in processing the permit application, including the costs of providing public notice. Notwithstanding the foregoing, the commission shall not require an applicant for a permit for one single-family dwelling to reimburse it for litigation costs or fees that the commission may incur in defending a judicial challenge to the commission's approval of the permit.
(2) The executive director of the commission shall waive the filing and processing fee in full or in part for an application for a housing development that contains housing units the occupancy of which by persons of low or moderate income as defined in Health and Safety Code section 50093 is assured for the period of time specified in Government Code section 65915(c)(1). Applications for projects that will create a greater public benefit will have a larger portion of the fee waived than applications for projects that will create a lesser public benefit. The executive director will determine the degree of public benefit based on a variety of factors, including, but not limited to (A) the total number of affordable units, (B) the proportion of affordable units in the development, (C) the degree of affordability, and (D) the availability of, and demand for, affordable units in the area. Applications for projects that will exceed current requirements for affordable housing under the law will receive a larger fee waiver than applications for projects which do not.
(3) For applications received prior to January 1, 2015, the executive director of the Commission shall reduce the filing fee for projects that are certified at a minimum of the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED) Gold standard or equivalent. The executive director shall determine if an alternative certification is equivalent to the LEED Gold standard based on a comprehensive review of the certification program's ability to ensure an equivalent or greater environmental benefit. After registering a project with an approved third-party certification program, applicants expecting to obtain a certification that qualifies for the above-mentioned fee reduction must submit 60% of the filing fee required pursuant to section 13055 and a letter of credit or other cash substitute approved by the executive director in the amount of the remainder of the required filing fee. After submitting proof of certification at a minimum of LEED Gold or equivalent, the letter of credit or other cash substitute will be released by the Commission to the applicant. If the applicant does not receive a minimum of LEED Gold certification or equivalent within three years of the date of permit issuance, the Commission will cash the letter of credit or other cash substitute. The executive director may grant an extension of the three year deadline for good cause. Request for extension must be submitted to the executive director in writing at least 60 days prior to the deadline, outlining the reason for the request and the expected completion date. The extension shall not exceed one year.
(i) The required fee shall be paid in full at the time an application is filed. However, applicants for an administrative permit shall pay an additional fee after filing if the executive director or the commission determines that the application cannot be processed as an administrative permit. The additional fee shall be the amount necessary to increase the total fee paid to the regular fee. The regular fee is the fee determined pursuant to this section. In addition, if the executive director or the commission determines that changes in the nature or description of the project that occur after the initial filing result in a change in the amount of the fee required pursuant to this section, the applicant shall pay the amount necessary to change the total fee paid to the fee so determined. If the change results in a decreased fee, a refund will be due only if no significant staff review time has been expended on the original application. If the change results in an increased fee, the additional fee shall be paid before the permit application is scheduled for hearing by the commission. If the fee is not paid prior to commission action on the application, the commission shall impose a special condition of approval of the permit. Such special condition shall require payment of the additional fee prior to issuance of the permit.
Credits
Note: Authority cited: Section 30333, Public Resources Code. Reference: Section 30620(c), Public Resources Code.
History
1. Amendment filed 6-10-77; effective thirtieth day thereafter (Register 77, No. 24).
2. Amendment of subsections (a) and (b) filed 1-28-81; effective thirtieth day thereafter (Register 81, No. 5).
3. Amendment of subsection (d) filed 8-14-81; effective thirtieth day thereafter (Register 81, No. 33).
4. Amendment filed 5-30-91 as an emergency; operative 5-30-91 (Register 91, No. 31). A Certificate of Compliance must be transmitted to OAL by 9-27-91 or emergency language will be repealed by operation of law on the following day.
5. Certificate of Compliance as to 5-30-91 order transmitted to OAL 9-18-92 and filed 10-21-92 (Register 92, No. 43).
6. Amendment filed 9-20-99; operative 10-20-99 (Register 99, No. 39).
7. Amendment of article heading, section and Note filed 3-14-2008; operative 3-14-2008 pursuant to Government Code section 11343.4 (Register 2008, No. 11).
8. Editorial correction of subsection (a)(5)(B)(1) (Register 2008, No. 18).
9. Change without regulatory effect amending section filed 8-14-2012 pursuant to section 100, title 1, California Code of Regulations (Register 2012, No. 33).
10. Change without regulatory effect amending section filed 8-6-2013 pursuant to section 100, title 1, California Code of Regulations (Register 2013, No. 32).
11. Change without regulatory effect amending section filed 8-7-2014 pursuant to section 100, title 1, California Code of Regulations (Register 2014, No. 32).
12. Change without regulatory effect amending section filed 8-4-2015 pursuant to section 100, title 1, California Code of Regulations (Register 2015, No. 32).
13. Change without regulatory effect amending section filed 7-25-2016 pursuant to section 100, title 1, California Code of Regulations (Register 2016, No. 31).
14. Change without regulatory effect amending section filed 7-13-2017 pursuant to section 100, title 1, California Code of Regulations (Register 2017, No. 28).
15. Change without regulatory effect amending section filed 8-9-2018 pursuant to section 100, title 1, California Code of Regulations (Register 2018, No. 32).
16. Change without regulatory effect amending section and Note filed 8-14-2019 pursuant to section 100, title 1, California Code of Regulations (Register 2019, No. 33).
17. Amendment of subsection (d)(2) filed 11-27-2019; operative 1-1-2020 (Register 2019, No. 48).
18. Change without regulatory effect amending section filed 7-23-2020 pursuant to section 100, title 1, California Code of Regulations (Register 2020, No. 30).
19. Change without regulatory effect amending section filed 8-9-2021 pursuant to section 100, title 1, California Code of Regulations (Register 2021, No. 33).
20. Change without regulatory effect amending section filed 8-10-2022 pursuant to section 100, title 1, California Code of Regulations (Register 2022, No. 32).
21. Change without regulatory effect amending section filed 8-23-2023 pursuant to section 100, title 1, California Code of Regulations (Register 2023, No. 34).
This database is current through 4/12/24 Register 2024, No. 15.
Cal. Admin. Code tit. 14, § 13055, 14 CA ADC § 13055
End of Document |