§ 2323. On Site Inspection of Organic Input Material Manufacturers.
3 CA ADC § 2323Barclays Official California Code of Regulations
3 CCR § 2323
§ 2323. On Site Inspection of Organic Input Material Manufacturers.
All inspection records compiled by the third-party organization shall be made available to the secretary upon request. When a third-party organization is conducting a site inspection, the inspection shall be consistent with the secretary's inspection protocol, which requires all locations manufacturing liquid organic input materials with a total nitrogen claim higher than 3% to have at least two inspections per year, one being unannounced. The third-party organization shall notify the department of the date of the inspection at least 72 hours in advance; department representatives may be present at the inspection.
(c) Organic input materials manufacturers shall maintain all the records demonstrating compliance with the NOP standards for a period of five years and submit complete documentation describing all ingredients, manufacturing processes, process control information, laboratory analysis of incoming ingredients and finished products, and other information as required by the Secretary.
Credits
Note: Authority cited: Sections 407, 14502, 14601, 14641 and 14642, Food and Agricultural Code. Reference: Sections 14601 and 14612, Food and Agricultural Code.
History
1. New section filed 2-28-2012; operative 3-29-2012 (Register 2012, No. 9).
2. Amendment filed 6-22-2017; operative 10-1-2017 (Register 2017, No. 25).
3. Amendment of subsection (c) and Note filed 4-13-2020; operative 4-13-2020 pursuant to Government Code section 11343.4(b)(3) (Register 2020, No. 16).
This database is current through 5/10/24 Register 2024, No. 19.
Cal. Admin. Code tit. 3, § 2323, 3 CA ADC § 2323
End of Document |