§ 1520.10. Contracting in Phases.
Where the Director determines it is necessary or desirable for a project to be performed in separate phases, the Director may negotiate a price for the initial phase work. To establish a contract price for the initial portion of phased work, the Director must first determine that the chosen firm is best qualified to perform the entire project. A contract for work to be performed in phases without a negotiated total contract price must provide that the state may, at its option utilize that firm to perform other phases of the work to be later negotiated and reflected in a subsequent written instrument. The procedures established herein with respect to estimates and negotiation as specified herein shall otherwise apply.
Note: Authority cited: Section 4526, Government Code. Reference: Section 4526, Government Code; and Article XXII, California Constitution, Sections 1-2.
HISTORY
1. Renumbering of former section 1520.6 to new section 1520.10, including amendment of section and Note filed 10-2-2006; operative 11-1-2006 (Register 2006, No. 40).