Home Table of Contents

§ 2980.10. Contracting in Phases.

2 CA ADC § 2980.10Barclays Official California Code of Regulations

Barclays California Code of Regulations
Title 2. Administration
Division 3. State Property Operations
Chapter 1. State Lands Commission (Refs & Annos)
Article 13. Contracts Securing Architectural, Landscape Architecture, Engineering, Environmental, Land Surveying, and Construction Project Management Services
2 CCR § 2980.10
§ 2980.10. Contracting in Phases.
Should the Executive Officer determine that it is necessary or desirable to have a given project requiring architectural and engineering services performed in phases, it will not be necessary to negotiate the total contract price or compensation provisions at the time the initial phase is negotiated, provided that the Executive Officer shall have determined that the firm is the best qualified to perform the whole project a fair and reasonable cost and that the contract contains provisions that the State, at its option, may use the firm for other phases and that the firm will accept a fair and reasonable price for subsequent phases to be later negotiated and reflected in a subsequent written instrument. The procedure with regard to estimates and negotiation shall otherwise be applicable.

Credits

Note: Authority cited: Section 4526, Government Code; Section 6108, Public Resources Code. Reference: Section 4528, Government Code.
History
1. Renumbering and amendment of former section 2980.8 to section 2980.10 filed 8-25-2014; operative 10-1-2014 (Register 2014, No. 35).
This database is current through 7/12/24 Register 2024, No. 28.
Cal. Admin. Code tit. 2, § 2980.10, 2 CA ADC § 2980.10
End of Document