Home Table of Contents

§ 2821. Pump Design Requirements.

23 CA ADC § 2821BARCLAYS OFFICIAL CALIFORNIA CODE OF REGULATIONS

Barclays Official California Code of Regulations Currentness
Title 23. Waters
Division 3. State Water Resources Control Board and Regional Water Quality Control Boards
Chapter 20. Standards for the Removal of Sewage from Vessels
Article 2. Design and Construction
23 CCR § 2821
§ 2821. Pump Design Requirements.
Pumps provided at the pumpout facility for the transfer of waste from vessel to the pumpout facility and from the pumpout facility to the disposal system shall:
(a) Be of self-priming and non-clogging design.
(b) Be of sufficient size and capacity to complete the transfer operation in a reasonable amount of time when operating against the maximum anticipated head.
(c) Be designed and installed to prevent leakage or spillage.
(d) Be designed and installed to meet all safety requirements.
(e) Be constructed of corrosion-resistant material.
The pumps may be either of fixed or portable type installation.
Note: Authority cited: Sections 775, 776, 777 and 778, Harbors and Navigation Code. Reference: Sections 775, 776, 777 and 778, Harbors and Navigation Code
HISTORY
1. New NOTE filed 10-1-85; effective thirtieth day thereafter (Register 85, No. 40).
This database is current through 6/17/22 Register 2022, No. 24
23 CCR § 2821, 23 CA ADC § 2821
End of Document