Home Table of Contents

§ 1935.4. Production Casing.

14 CA ADC § 1935.4Barclays Official California Code of Regulations

Barclays California Code of Regulations
Title 14. Natural Resources
Division 2. Department of Conservation
Chapter 4. Development, Regulation, and Conservation of Oil and Gas Resources (Refs & Annos)
Subchapter 4. State-Wide Geothermal Regulations
Article 3. Drilling
14 CCR § 1935.4
§ 1935.4. Production Casing.
Production casing may be set above or through the producing or injection zone and cemented above the objective zones. Sufficient cement shall be used to exclude overlying formation fluids from the zone, to segregate zones, and to prevent movement of fluids behind the casing into zones that contain usable groundwater. Production casing shall either be cemented with sufficient cement to fill the annular space from the shoe to the surface or lapped into intermediate casing, if run. Production casing lapped into an intermediate string, shall overlap at least 15 meters (about 50 feet); the lap shall be cemented solidly; and shall be pressure tested to ensure its integrity.

Credits

Note: Authority cited: Section 3714, Public Resources Code. Reference: Sections 3739 and 3740, Public Resources Code.
History
1. Amendment filed 8-16-79; effective thirtieth day thereafter (Register 79, No. 33).
This database is current through 4/26/24 Register 2024, No. 17.
Cal. Admin. Code tit. 14, § 1935.4, 14 CA ADC § 1935.4
End of Document