§ 819.03. Application Review, Verification and Drills.
14 CA ADC § 819.03Barclays Official California Code of RegulationsEffective: January 1, 2023
Barclays California Code of Regulations
Title 14. Natural Resources
Division 1. Fish and Game Commission--Department of Fish and Game (Refs & Annos)
Subdivision 4. Office of Spill Prevention and Response
Chapter 3. Oil Spill Prevention and Response Planning
Subchapter 3.5. Oil Spill Response Organization Ratings
Effective: January 1, 2023
14 CCR § 819.03
§ 819.03. Application Review, Verification and Drills.
(4) A requested rating may be denied or an existing rating may be modified if the Administrator determines that the oil spill response organization applicant fails to meet the rating criteria of any response services, based upon inspection, verification or performance at an announced or unannounced drill or actual spill, or for other reasons as determined by the Administrator. The Administrator may require the satisfactory completion of an unannounced drill of a rated oil spill response organization prior to being granted a modified rating, or prior to reinstatement of a revoked or suspended rating.
(5) Upon meeting the requirements of this subchapter, an oil spill response organization will receive an approval letter from the Administrator that will state the type of response services for which the rating is valid, the area contingency plan or response planning area where the rating(s) apply, rating time frames, on-water or terrestrial daily containment and recovery rates, storage capacity, shoreline protection, as applicable, and any conditions or restrictions.
Oil spill response organization ratings will be issued to the oil spill response organization subject to the following conditions:
(1) Equipment, equipment maintenance and inspection records, registration records (e.g. vehicles and vessels), personnel training records, and personnel-specific equipment qualifications must be available for inspection and verification by the Administrator. Any resources not on site at the time of an inspection will not be counted until verified by subsequent inspection.
Trenching and Shoring (sections 1504, 1539-1547)
Electrical Safety (sections 2299-2974)
Injury and Illness Prevention Program (section 3203)
Employee Exposure Records (section 3204)
Transporting Employees (section 3702)
Crane Safety (sections 4885-5049)
Noise/Hearing Conservation (sections 5095-5100)
Ergonomics (section 5110)
Respiratory Protection (sections 5141 and 5144)
Airborne Contaminants/Employee Exposure Monitoring (section 5155)
Confined Space (sections 5157-5159)
Hazardous Waste Operation and Emergency Response (section 5192)
Hazard Communication (section 5194)
Benzene Standard (section 5218)
(B) An oil spill response organization that has applied for a terrestrial service rating shall be subject to an initial announced equipment verification inspection, in each response planning area, unless the Administrator determines that facts or circumstances compel additional inspections to verify rated capabilities.
(C) Any contract or subcontract for response resources listed in the application must acknowledge the Office of Spill Prevention and Response personnel's right to inspect and verify listed contracted response resources or those response resources will not be counted. Inspection of subcontracted response resources shall be coordinated with the oil spill response organization whose application contains the subcontracted response resources.
Announced and unannounced equipment deployment drills shall be conducted to verify any or all of the elements of the response services provided by an oil spill response organization in its application prior to and subsequent to issuing a rating. The Administrator may determine if actual spill response may be substituted in lieu of a drill, as described in subsection 820.1(m) of subchapter 3.6.
All oil spill response organizations shall submit annual drill schedules to the Office of Spill Prevention and Response and conduct equipment deployment drills for response resources listed in the application, including subcontracted equipment, for any services for which they are rated. The exact dates of the drills shall be submitted 30 calendar days prior to the drill being conducted.
(A) At least fifty percent of all response equipment other than boom shall be drilled each year. All response equipment, including boom, shall be drilled over a two-year period. The oil spill response organization will ensure that this equipment is identified and the same equipment is not used repeatedly for each drill.
(C) Documentation that these drills have been performed shall be submitted to the Office of Spill Prevention and Response within 30 calendar days after completion of the drill. The equipment deployment drills pursuant to this subsection will also satisfy the equipment deployment drill requirement of section 818.02(l)(3) for any vessel, section 817.02(k)(3), or section 817.04(u) for any facility that utilizes the oil spill response organization's resources to fulfill the response element of the vessel or facility's own plan. These drills will not fulfill the semi-annual equipment deployment drill requirement of facility-owned equipment pursuant to section 817.02(k)(1)(B) or section 817.04(u).
Oil spill response organizations are subject to unannounced equipment deployment drills by the Office of Spill Prevention and Response to verify the ability of the oil spill response organization to respond and deploy equipment and personnel as stated in the oil spill response organization's application, prior to and subsequent to receiving a rating. Unannounced equipment deployment drills will only be held to verify ratings of the first 24 hours of capability. Unannounced terrestrial service rating drills shall only include equipment and personnel inspections.
2. Each oil spill response organization applying for a rating to provide shoreline protection services shall be subject to one unannounced drill that tests its ability to provide shoreline protection services in each area contingency plan or geographic response plan in which it applies to provide shoreline protection services.
(B) For a requested terrestrial service rating within a single response planning area, an unannounced drill will not require equipment or personnel to be mobilized. However, if an oil spill response organization applies for a terrestrial service rating within more than one response planning area, then the Administrator may conduct one or more unannounced drills requiring mobilization of response resources.
Credits
Note: Authority cited: Sections 8670.7, 8670.7.5, 8670.28 and 8670.30, Government Code. Reference: Sections 8670.19, 8670.28 and 8670.30, Government Code.
History
1. New section filed 11-4-93 with the Secretary of State by the Department of Fish and Game; operative 11-4-93. Submitted to OAL for printing only pursuant to Government Code section 8670.28(e) (Register 93, No. 45).
2. Amendment of section and Note filed 6-1-98; operative 6-1-98 pursuant to Government Code section 11343.4(d) (Register 98, No. 23).
3. Change without regulatory effect amending subsection (c)(2) and amending Note filed 8-29-2000 pursuant to section 100, title 1, California Code of Regulations (Register 2000, No. 35).
4. Amendment of section heading, section and Note filed 10-9-2002; operative 10-9-2002 pursuant to Government Code section 11343.4 (Register 2002, No. 41).
5. Amendment of subsections (c)(3)-(5) and (c)(5)(B)1. filed 3-20-2007; operative 5-1-2007 (Register 2007, No. 12).
6. Amendment of subsections (c)(5)-(c)(5)(A)1., repealer of subsection (c)(5)(A)2. and amendment of subsection (c)(5)(A)4. filed 11-14-2014; operative 1-1-2015 (Register 2014, No. 46).
7. Amendment of section and Note filed 10-12-2015 as an emergency; operative 10-12-2015. Submitted to OAL for printing only pursuant to Government Code section 8670.7.5, which provides that the regulation shall be deemed an emergency, shall be exempt from describing facts showing the need for immediate action, shall not be subject to OAL review, and shall remain in effect for twelve months or until readopted, whichever is earlier (Register 2015, No. 42).
8. Amendment of section and Note refiled 10-4-2016 as an emergency, including further amendment of Note; operative 10-4-2016. Submitted to OAL for printing only pursuant to Government Code section 8670.7.5, which provides that the regulation shall be deemed an emergency, shall be exempt from describing facts showing the need for immediate action, shall not be subject to OAL review, and shall remain in effect for twelve months or until readopted, whichever is earlier (Register 2016, No. 41).
9. Amendment of section and Note refiled 8-7-2017 as an emergency; operative 8-7-2017. Submitted to OAL for printing only pursuant to Government Code section 8670.7.5, which provides that the regulation shall be deemed an emergency, shall be exempt from describing facts showing the need for immediate action, shall not be subject to OAL review, and shall remain in effect for twelve months or until readopted, whichever is earlier (Register 2017, No. 32).
10. Amendment of section and Note refiled 7-30-2018 as an emergency; operative 7-30-2018. Submitted to OAL for filing and printing only pursuant to Government Code section 8670.7.5, as a deemed emergency and not subject to OAL review, and shall remain in effect for twelve months or until readopted, whichever is earlier (Register 2018, No. 31).
11. Certificate of Compliance as to 7-30-2018 order, including amendment of section, transmitted to OAL 10-31-2018 and filed 12-17-2018; amendments effective 1-1-2019 pursuant to Government Code section 11343.4(b)(3) (Register 2018, No. 51).
12. Amendment of subsections (d) and (d)(2)(H) filed 9-26-2022; operative 1-1-2023 (Register 2022, No. 39).
This database is current through 5/10/24 Register 2024, No. 19.
Cal. Admin. Code tit. 14, § 819.03, 14 CA ADC § 819.03
End of Document |