§ 2745.6. RMP Program 2 Prevention Program Component.

19 CA ADC § 2745.6Barclays Official California Code of Regulations

Barclays California Code of Regulations
Title 19. Public Safety
Division 2. California Governor's Office of Emergency Services
Chapter 4.5. California Accidental Release Prevention (CalARP) Program Detailed Analysis
Article 3. Risk Management Plan Components and Submission Requirements
19 CCR § 2745.6
§ 2745.6. RMP Program 2 Prevention Program Component.
(a) For each Program 2 process, the owner or operator shall provide in the RMP the information indicated in sections (b) through (l). If the same information applies to more than one covered process, the owner or operator may provide the information only once, but shall indicate to which processes the information applies.
(b) The five- or six-digit NAICS code that most closely corresponds to the process.
(c) The name(s) of the chemical(s) covered.
(d) The date of the most recent review or revision of the safety information and a list of federal or state regulations or industry-specific design codes and standards used to demonstrate compliance with the safety information requirement.
(e) The date of completion of the most recent hazard review or update.
(1) The expected date of completion of any changes resulting from the hazard review;
(2) Major hazards identified;
(3) Process controls in use;
(4) Mitigation systems in use;
(5) Monitoring and detection systems in use; and,
(6) Changes since the last hazard review.
(f) The date of the most recent review or revision of operating procedures.
(g) The date of the most recent review or revision of training programs;
(1) The type of training provided -- classroom, classroom plus on the job, on the job; and,
(2) The type of competency testing used.
(h) The date of the most recent review or revision of maintenance procedures and the date of the most recent equipment inspection or test and the equipment inspected or tested.
(i) The date of the most recent compliance audit and the expected date of completion of any changes resulting from the compliance audit.
(j) The date of the most recent incident investigation and the expected date of completion of any changes resulting from the investigation.
(k) The date of the most recent change that triggered a review or revision of safety information, the hazard review, operating or maintenance procedures, or training.
(l) The owner or operator shall submit the following external events analysis information:
(1) The types of natural and human caused external events considered in PHA Section 2760.2 or Hazard Review Section 2755.2.
(2) The estimated magnitude or scope of external events which were considered. If not known, the owner or operator of the stationary source shall work closely with the UPA to determine what is required. If seismic events are applicable, the parameters used in the consideration of the seismic analysis and which edition of the Building Code was used when the process was designed.
(3) For each external event, with a potential to create a release of a regulated substance that will reach an endpoint offsite, apply sections (e)(1) through (e)(6).
(4) The date of the most recent field verification that equipment is installed and maintained as designed.

Credits

Note: Authority cited: Sections 25531 and 25534.05, Health and Safety Code. Reference: Section 25531, Health and Safety Code; and Section 68.170, Part 68, Title 40, Code of Federal Regulations.
History
1. New section filed 7-10-97 as an emergency; operative 7-10-97 (Register 97, No. 28). A Certificate of Compliance must be transmitted to OAL by 11-7-97 or emergency language will be repealed by operation of law on the following day.
2. New section refiled 10-31-97 as an emergency; operative 11-7-97 (Register 97, No. 44). A Certificate of Compliance must be transmitted to OAL by 3-9-98 or emergency language will be repealed by operation of law on the following day.
3. New section refiled 3-9-98 as an emergency; operative 3-9-98 (Register 98, No. 11). A Certificate of Compliance must be transmitted to OAL by 7-7-98 or emergency language will be repealed by operation of law on the following day.
4. New section refiled 7-7-98 as an emergency; operative 7-7-98 (Register 98, No. 28). A Certificate of Compliance must be transmitted to OAL by 11-4-98 or emergency language will be repealed by operation of law on the following day.
5. Certificate of Compliance as to 7-7-98 order, including repealer and new section, transmitted to OAL 10-7-98 and filed 11-16-98 (Register 98, No. 47).
6. Amendment of subsection (b) filed 6-28-2004; operative 6-28-2004. Submitted to OAL for printing only (Register 2004, No. 27).
7. Amendment of subsection (l)(2) filed 10-8-2014; operative 1-1-2015 (Register 2014, No. 41).
8. Amendment of subsection (l)(2) filed 8-3-2017; operative 10-1-2017 (Register 2017, No. 31).
This database is current through 9/22/23 Register 2023, No. 38.
Cal. Admin. Code tit. 19, § 2745.6, 19 CA ADC § 2745.6