Home Table of Contents

§ 1623.1. Large POU and Large CCA Requirements for Load Management Standards.

20 CA ADC § 1623.1Barclays Official California Code of RegulationsEffective: April 1, 2023

Barclays California Code of Regulations
Title 20. Public Utilities and Energy
Division 2. State Energy Resources Conservation and Development Commission (Refs & Annos)
Chapter 4. Energy Conservation
Article 5. Load Management Standards
Effective: April 1, 2023
20 CCR § 1623.1
§ 1623.1. Large POU and Large CCA Requirements for Load Management Standards.
(a) Large POU Plans to Comply with Load Management Standards
(1) Within six months of April 1, 2023, each Large POU, and within one year of April 1, 2023, each Large CCA, shall submit a compliance plan that is consistent with this Section 1623.1 to its rate approving body for adoption in a duly noticed public meeting to be held within 60 days after the plan is submitted. The plan shall describe how the Large POU or the Large CCA will meet the goals of encouraging the use of electrical energy at off-peak hours, encouraging the control of daily and seasonal peak loads to improve electric system efficiency and reliability, lessening or delaying the need for new electrical capacity, and reducing fossil fuel consumption and greenhouse gas emissions. The plan shall include consideration of programs and rate structures as specified in section 1623.1 (b)-(d).
(A) The plan must evaluate cost effectiveness, equity, technological feasibility, benefits to the grid, and benefits to customers of marginal cost-based rates for each customer class.
(B) If after consideration of the factors in Subsection 1623.1(a)(1)(A) the plan does not propose development of marginal cost-based rates, the plan shall propose programs that enable automated response to marginal cost signal(s) for each customer class and evaluate them based on their cost-effectiveness, equity, technological feasibility, benefits to the grid, and benefits to customers.
(C) The Large POU or the Large CCA shall review the plan at least once every three years after the plan is adopted. The Large POU or Large CCA shall submit a plan update to its rate approving body where there is a material change to the factors considered pursuant to Subsections 1623.1 (a)(1)(A) and (B).
(2) The rate approving body of a Large POU or a Large CCA may approve a plan, or material revisions to a previously approved plan, that delays compliance or modifies compliance with the requirements of Subsections 1623.1 (b)-(c), if the rate approving body determines that the plan demonstrates any of the following:
(A) that despite a Large POU's or Large CCA's good faith efforts to comply, requiring timely compliance with the requirements of this article would result in extreme hardship to the Large POU or the Large CCA,
(B) requiring timely compliance with the requirements of this article would result in reduced system reliability (e.g., equity or safety) or efficiency,
(C) requiring timely compliance with the requirements of this article would not be technologically feasible or cost-effective for the Large POU to implement, or
(D) that despite the Large POU's or the Large CCA's good faith efforts to implement its load management standard plan, the plan must be modified to provide a more technologically feasible, equitable, safe or cost-effective way to achieve the requirements of this article or the plan's goals.
(3) Commission Approval of Large POU and Large CCA Plans to Comply with Load Management Standards and Material Plan Revisions
(A) Within thirty (30) days after adoption of a plan or material plan revision pursuant to this subdivision, each large POU and Large CCA shall submit its plan to comply with the requirements of this Section 1623.1 or material plan revision to the Executive Director.
(B) The Executive Director shall review plans or material plan revisions and either return them to the Large POU or the Large CCA for changes or submit them to the Commission for review and potential approval. The Executive Director shall make an initial determination whether the plan or material plan revision is consistent with the requirements of Section 1623.1(a)(1) and (2). In reviewing plans and material plan revisions, the Executive Director may request additional information or recommend changes to make it consistent with the requirements of Section 1623.1(a) (1) and (2). The Large POU or Large CCA shall respond to requests or recommendations within ninety (90) days of receipt from the Executive Director. The Executive Director shall then submit the plan or material plan revision to the Commission with a recommendation on whether to approve it. The Commission may also request additional information and shall approve plans and material plan revisions which are consistent with Section 1623.1(a)(1) and (2), and which show a good faith effort to meet the goals listed in Section 1623.1(a)(1) and (2). The Commission may place conditions on its approval of plans or material plan revisions that are necessary to guarantee that the plan or material plan revision will comply with Section 1623.1 (a)(1) and (2) by a date certain.
(C) Each Large POU and Large CCA shall submit to the Executive Director annual reports demonstrating their implementation of plans approved pursuant to this subsection, as such plans may be revised pursuant to this subsection. The reports shall be submitted one year after plans are approved pursuant to subsection (2) and annually thereafter.
(b) Large POU and Large CCA Marginal Cost-Based Rates and Programs. Each Large POU and each Large CCA shall develop marginal cost-based rates or public programs structured according to the requirements of this article.
(1) Total marginal cost shall be calculated as the sum of the marginal energy cost, the marginal capacity cost (generation, transmission, and distribution), and any other appropriate time and location dependent marginal costs, including the locational marginal cost of associated greenhouse gas emissions, on a time interval of no more than one hour. Energy cost computations shall reflect locational marginal cost pricing as determined by the associated balancing authority, such as the Los Angeles Department of Water and Power, the Balancing Authority of Northern California, or other balancing authority. Marginal capacity cost computations shall reflect the variations in the probability and value of system reliability of each component (generation, transmission, and distribution).
(2) Within two (2) years of April 1, 2023, each Large POU, and within twenty-seven (27) months of April 1, 2023, each Large CCA, shall apply to its rate-approving body for approval of at least one marginal cost-based rate, that meets the requirements of Subsection 1623.1(b)(1). Large CCAs may apply for approval of marginal cost-based rates that are offered by the Large IOUs in whose service areas the Large CCAs exist in.
(A) Large POUs and Large CCAs shall apply for approval of marginal cost-based rates only for those customer classes for which the rate-approving body determines such a rate will materially reduce peak load.
(B) Large POUs and Large CCAs shall provide the Commission with informational copies of tariff applications when they are submitted to their rate-approving bodies.
(3) No later than eighteen (18) months after April 1, 2023, each Large POU and each Large CCA shall submit to the Executive Director a list of load flexibility programs deemed cost-effective by the Large POU or the Large CCA.
(A) The portfolio of identified programs shall provide at least one option for automating response to MIDAS signals for each customer class that the rate-approving body determines such a program will materially reduce peak load.
(B) The programs shall allow customers to respond to MIDAS signals indicating marginal cost-based rates, marginal prices, hourly or sub-hourly marginal greenhouse gas emissions, or other Commission-approved marginal signal(s).
(4) Within three (3) years of April 1, 2023, each Large POU, and within fifty-one (51) months of April 1, 2023, each Large CCA, shall offer to each of its electricity customers voluntary participation in either a marginal cost-based rate developed according to Subsection 1623.1(b)(2), if such rate is approved by the Large POU's or Large CCA's rate-approving body, or a cost-effective program identified according to Subsection 1623.1(b)(3).
(5) Each Large POU and Large CCA shall conduct a public information program to inform and educate the affected customers why marginal cost-based rates or load flexibility programs, and automation are needed, how they will be used, and how these rates or programs can save the customer money.
(c) Publication of Machine-Readable Electricity Rates. No later than three (3) months after April 1, 2023, each Large POU and each Large CCA shall upload its existing time-dependent rates applicable to its customers to the Commission's Market Informed Demand Automation Server (MIDAS) database. Each Large POU and Large CCA shall upload all time-dependent rates, including those approved after April 1, 2023, to MIDAS prior to the effective date of the time-dependent rates each time a time-dependent rate is approved by the rate-approving body and each time a time-dependent rate changes.
The time-dependent rates uploaded to the MIDAS database shall include all applicable time-dependent cost components, including, but not limited to, generation, distribution, and transmission. The Commission maintains public access to the MIDAS database through an Application Programming Interface (API) that, provided a Rate Identification Number (RIN), returns information sufficient to enable automated response to marginal grid signals, such as price, emergency events, and greenhouse gas emissions.
(d) Enforcement. The Executive Director may, after reviewing the matter with the Large POU or the Large CCA, file a complaint with the Commission following the process set forth in Sections 1233.1 to 1233.4 or seek injunctive relief if a Large POU or Large CCA:
(1) Fails to adhere to its approved load management standard plan,
(2) Materially modifies its approved load management standard plan without approval,
(3) Does not provide information by a deadline established by the Executive Director or the Commission, or
(4) Violates the provisions of this article.
(e) There shall be no reimbursement to local government entities for the costs of carrying out the programs mandated by these standards, because the Commission has found these standards to be cost-effective. The savings which these entities will realize as a result of carrying out these programs will outweigh the costs associated with implementing these programs.

Credits

Note: Authority cited: Sections 25213, 25218(e) and 25403.5, Public Resources Code. Reference: Sections 25132 and 25403.5, Public Resources Code.
History
1. New section filed 1-20-2023; operative 4-1-2023 (Register 2023, No. 3).
This database is current through 4/26/24 Register 2024, No. 17.
Cal. Admin. Code tit. 20, § 1623.1, 20 CA ADC § 1623.1
End of Document