Article 3. Electrical Requirements
- § 1130. Application and Scope.
- § 1132. Permanent Building Electrical Regulations.
- § 1134. Electrical Requirements.
- § 1136. Conductors and Equipment.
- § 1138. Energizing.
- § 1140. Distribution System.
- § 1142. Design and Plan Requirements—Electrical.
- § 1144. Electric Heating. [Repealed]
- § 1146. Voltage Drop.
- § 1148. Overcurrent Protection.
- § 1150. Park Electrical Disconnecting Means.
- § 1151. Lot Electrical Disconnecting Means.
- § 1152. Ground-Fault Protection.
- § 1153. Equipment Grounding.
- § 1154. Primary System Grounding—600 Volts or Less.
- § 1156. Primary System Grounding—over 600 Volts.
- § 1158. Secondary Systems—Lot Service Equipment.
- § 1160. Secondary Systems—Other than Lot Service Equipment.
- § 1162. Grounding Connections.
- § 1163. Grounding of Units.
- § 1164. Feeder Assembly.
- § 1166. Grounding Conductors.
- § 1170. Protection of Outdoor Equipment.
- § 1172. High-Voltage Conductors. [Repealed]
- § 1176. Aluminum Conductors.
- § 1178. Mechanical Protection.
- § 1180. Lot Electrical Service.
- § 1182. Installation of Lot Service Equipment.
- § 1183. Access to Electrical Equipment.
- § 1184. Lot Location.
- § 1185. Electrical Appliances, Equipment, and Air Conditioning.
- § 1186. Lot Receptacles.
- § 1188. Existing Electrical Installations.
- § 1190. Authority to Order Disconnect-Electrical.