118.01.21.603. Renovation Projects
AR ADC 118.01.21.603Arkansas Administrative CodeEffective: December 25, 2021
Effective: December 25, 2021
Ark. Admin. Code 118.01.21.603
Formerly cited as AR ADC 014.01.4-6
118.01.21.603. Renovation Projects
For the activities listed below, the owner or operator shall submit a NOI to the Division by either handdelivery, postmarked by U.S. Postal Service, or postmarked by commercial delivery service at least 10 working days before asbestos stripping, removal work, or any other activity begins (such as site preparation that would break up or dislodge or similarly disturb asbestos-containing material). Such notice must be accompanied by the required fee which is described in Chapter 22 of this rule.
(A) For any renovation project, including any nonscheduled renovation operation involving the following amounts of RACM: at least 80 linear meters (260 linear feet) on pipes or at least 15 square meters (160 square feet) on other facility components, or at least one cubic meter (35 cubic feet) where the length could not be measured previously; or
Credits
Amended Oct. 8, 2011; Sept. 11, 2015; Dec. 25, 2021.
Current with amendments received through February 15, 2024. Some sections may be more current, see credit for details.
Ark. Admin. Code 118.01.21.603, AR ADC 118.01.21.603
End of Document |