007.04.10-18. System Installation
AR ADC 007.04.10-18Arkansas Administrative Code
Ark. Admin. Code 007.04.10-18
007.04.10-18. System Installation
18.2 Any clearing or grubbing shall be performed based on a site-specific plan, which minimizes the disturbance of the soil and protects the overall soil characteristics. It may be necessary to use flexible PVC tubing to work around or over objects in the dispersal field; however the number of emitters shall not be reduced.
18.9 A start-up system check shall be performed before the system is placed in operation. All operational functions that would be expected during routine operations shall be performed in a specified time period of not less than 24 hours. This operational test shall include but not be limited to: timed dose functions, volume loading, flow rates, pressures at the inlet and outlet of each zone, pressures at the inlet and outlet of filters, leak detection, flushing, and alarms.
Credits
Adopted July 8, 2010.
Current with amendments received through February 15, 2024. Some sections may be more current, see credit for details.
Ark. Admin. Code 007.04.10-18, AR ADC 007.04.10-18