126.03.23-6. Benefit/Cost Tests
AR ADC 126.03.23-6Arkansas Administrative CodeEffective: April 20, 2018
Effective: April 20, 2018
Ark. Admin. Code 126.03.23-6
126.03.23-6. Benefit/Cost Tests
A. Administrators shall present sufficiently detailed calculations, sensitivity analyses, and supporting testimony of the effect of the proposed conservation and energy efficiency program using each of the following tests set forth in the California Standard Practice Manual: Economic Analysis of Demand-Side Programs and Projects, (State of California, Governor's Office of Planning and Research, July 2002), (hereafter “Manual”): The Participant Test, The Ratepayer Impact Measure Test, The Total Resource Cost Test, and the Program Administrator Cost Test.
The Commission will rely on the formulae found in the Manual. However, the Commission may rely on some inputs contained in the Manual and not on others. Furthermore, the costs and benefits contained in the Manual are suggestions and are not endorsed by the Commission for every program. For this reason, the Commission will not limit the costs and benefits that can be considered in the benefit/cost tests to those listed therein.
Cost-effectiveness results shall be presented on both a program and portfolio basis.
Administrators may submit additional economic analyses and benefit/cost test information in support of a proposed program.
Results of the tests shall be presented consistent with the descriptions shown in Table 1, or by other means as approved by the Commission.
TABLE I -- Cost-Effectiveness Tests with Primary and Secondary Means of Expressing Test Results
Participant Test | |
---|---|
Primary | Secondary |
Net present value (all participants) | Discounted payback (years) |
Benefit-cost ratio (“BCR”) | |
Net present value (average participant) | |
Ratepayer Impact Measure | |
Lifecycle revenue impact per Unit of energy (kWh or therm) or demand customer (kW) | Lifecycle revenue impact per unit |
Net present value | Annual revenue impact (by year, per kWh, kW, ccf, or customer) |
First-year revenue impact (per kWh, kW, ccf, or customer) | |
BCR | |
Total Resource Cost | |
Net present value (NPV) | BCR |
Levelized cost (cents or dollars per unit of energy or demand) | |
Societal (NPV, BCR) | |
Program Administrator Cost | |
Net present value | BCR |
Levelized cost (cents or dollars per unit of energy or demand) |
Credits
Amended July 3, 2011; June 22, 2014; April 20, 2018.
Current with amendments received through February 15, 2024. Some sections may be more current, see credit for details.
Ark. Admin. Code 126.03.23-6, AR ADC 126.03.23-6
End of Document |