007.10.22-XVI. Plan Review of Future Construction
When a bakery or candy factory is hereafter constructed or extensively remodeled, or when an existing structure is converted for use as a bakery or candy factory, properly prepared plans and specifications for such construction, remodeling or alteration, showing layout, arrangement and construction materials and the location, size and type of fixed equipment and facilities shall be submitted to the Arkansas State Department of Health for approval before such work is begun.
Current with amendments received through February 15, 2024. Some sections may be more current, see credit for details.
Ark. Admin. Code 007.10.22-XVI, AR ADC 007.10.22-XVI