Rule 10. Rules Pertaining to Drip Dispersal Systems
- 007.04.10–1. Authority and Purpose
- 007.04.10–2. Definitions
- 007.04.10–3. Site Assessment
- 007.04.10–4. Drip Tubing and Emitters
- 007.04.10–5. Pretreatment Requirements
- 007.04.10–6. Filters and Screens
- 007.04.10–7. Control Panel
- 007.04.10–8. Flow Meters and Pressure Gauges
- 007.04.10–9. Supply Line and Manifold
- 007.04.10–10. Return Manifold and Line
- 007.04.10–11. Flexible Hose and Tubing
- 007.04.10–12. Air/Vacuum Relief Valves
- 007.04.10–13. Flushing Valves
- 007.04.10–14. Pipe and Specialty Connectors and Fittings Standard
- 007.04.10–15. Headworks Boxes
- 007.04.10–16. Zones and Related Components
- 007.04.10–17. Pressure Regulators
- 007.04.10–18. System Installation
- 007.04.10–19. System Operation and Maintenance
- 007.04.10–20. System Design
- 007.04.10–21. Training and Certification
- 007.04.10–22. Variances and Exemptions
- 007.04.10–23. Fees
- 007.04.10–24. Penalties
- 007.04.10–25. Severability
- 007.04.10–26. Repeal
- 007.04.10–27. Certification
- 007.04.10–28. Transferred to 007.04.10–27
- 007.04.10 Table I.
- 007.04.10 Table II.
- 007.04.10 Table III.